All Documents:

By title

By document
number

 

 

Note:
Documents that do not have document numbers are not included in this listing.

 

Large file size alert
This symbol means the document
may be a large
file size.

 



All documents by number

Common document prefixes

DOE/CAO DOE/TRU
DOE/CBFO DOE/WIPP
DOE/EA NM
DOE/EIS Other
DOE/NTP  

DOE/CAO                                                            Back to top

DOE/CAO 95-1095, Oct. 1995
Remote Handled Transuranic Waste Study

This study was conducted to satisfy the requirements defined by the WIPP Land Withdrawal Act and  considered by DOE to be a prudent exercise in the compliance certification process.

DOE/CAO 1996-2184
Compliance Certification Application

DOE's 72,000-page application submitted to the U.S. Environmental Protection Agency showing how WIPP meets all applicable federal transuranic radioactive waste standards. (Click on CCA -1996)

DOE/CAO-00-3124, Feb. 2000               
Pioneering Nuclear Waste Disposal

Documents the 40-plus year history of the Waste Isolation Pilot Plant and looks forward to challenges for the future.


DOE/CBFO                                                          Back to top

DOE/CBFO-94-1012 Rev. 9
Quality Assurance Program Document

Effective date: 12/21/07

DOE/CBFO-95-1076 Rev. 6.1
Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases

Effective date: 11/07

DOE/CBFO-95-1077 Rev. 7
Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes

Effective date: 9/06

DOE/CBFO 97-1224, Revision 3
Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (DSA), and Technical Safety Requirements (TSRs)

Approved November 2006
These Safety Evaluation Reports (SER) document the Department of Energy's review of the DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

DOE/CBFO  97-2273, Rev. 15,

WIPP Waste Information System User's Manual WWIS Version 6.2

Effective date: 5/08
 

DOE/CBFO 99-3119 Rev. 4.1
Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement (Effective date: 12/2005)

DOE/CBFO-01-1005 Rev.1
Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

Effective date: 8/05

DOE/CBFO-01-1006 Rev. 1
Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

Effective date: 4/08

DOE/CBFO-01-3107 Rev. 4
Performance Demonstration Program Management Plan

Effective date: 4/08


DOE/EA                                                               Back to top

DOE/EA-1340, Jan. 2001
Environmental Assessment for Conducting Astrophysics
and Other Basic Science Experiments at the WIPP Site

This document examines the potential environmental consequences from conducting particular types of scientific experiments in the experiment gallery at WIPP, including the potential cumulative impacts of conducting experiments with the operation of WIPP as a TRU waste repository.

DOE/EA-1404, January 2006 Final
Environmental Assessment for Actinide Chemistry and Repository Science Laboratory

This document examines the potential environmental impacts associated with the proposed construction and operation of an Actinide Chemistry and Repository Science Laboratory (ACRSL) along with other reasonable alternatives to support chemical research activities related to WIPP.


DOE/EIS                                                              Back to top

DOE/EIS 0026-S-2
WIPP Disposal Phase Supplemental Environmental Impact Statement (SEIS-II)

This document assesses whether to dispose of TRU waste at WIPP. This document also assesses reasonable options for transportation and other activities associated with disposal, as well as reasonable alternatives concerning quantities, sources, and treatment of TRU waste before disposal.

DOE/EIS-0200-SA-1
Supplement Analysis for the Proposed Characterization for Disposal of Contact Handled Transuranic Waste at the Waste Isolation Pilot Plant

This document examines the environmental impacts of the proposal to perform characterization activities required by the WIPP Hazardous Waste Facility Permit for contact-handled waste at the WIPP.

DOE/EIS-0026-SA-3
Supplement Analysis for the Disposal of Certain Rocky Flats Plutonium Bearing Materials at the Waste Isolation Pilot Plant

This document examines the environmental impacts of disposing of additional volumes of plutonium bearing materials from Rocky Flats at WIPP.  These plutonium bearing materials have plutonium concentrations similar to the Rocky Flats plutonium residues previously authorized for disposal at WIPP. 

DOE/EIS-0026-SA-4
Supplement Analysis for use of the 10-160B Transportation Cask for RH-TRU Waste Shipments to WIPP

This document examines the environmental impacts of using the 10-160B transportation cask for transporting remote-handled transuranic waste to WIPP.

DOE/EIS-0026-SA-06
 Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III containers
September 2007

This document examines the environmental impacts of using the Transuranic Package Transporter Model III (TRUPACT-III) containers for transporting contact-handled transuranic waste to WIPP.


DOE/NTP                                                         Back to top

DOE/NTP-96-1204 Rev. 3
The National TRU Waste Management Plan, Rev. 3

Effective date: 7/02

DOE/TRU                                                          Back to top

DOE/TRU-2006-3344
Transuranic Waste Baseline Inventory Report - 2004

The information presented in the report was used in support of the 2004 Compliance Recertification Application (CRA).  The TRU Waste Baseline Inventory Waste Profile forms reflect the information reported by the TRU waste sites.  (click on the titles to view individual sections)

Annual Transuranic Waste Inventory Report - 2007 DOE/TRU-2008-3379

Effective date: 04/08
The information presented in the report serves as a current baseline of the TRU waste inventory for disposal at WIPP and may be considered in future Compliance Recertification Applications. The TRU Waste Inventory Profile Reports (Appendices A, B, C) reflect the information reported by the TRU waste sites. (click on the titles to view individual sections) 


DOE/WIPP                                                          Back to top

DOE/WIPP 90-045 Rev. 8
Remote-Handled Transuranic Waste Content Codes (RH-TRUCON)

Effective date: 8/07

DOE/WIPP 93-004
WIPP Land Management Plan

Describes how the Department of Energy manages the WIPP Land Withdrawal Area.

DOE/WIPP-95-2065, Rev. 10
 WIPP Contact Handled (CH) Waste Documented Safety Analysis (DSA)

November 16, 2006, with approved page changes through August 28, 2007
Documents the safety analyses that develop and evaluate the adequacy of the WIPP CH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase.

DOE/WIPP-95-2125, Rev. 10

WIPP Contact Handled (CH) Technical Safety Requirements
November 16, 2006, with approved page changes through August 28, 2007
This document contains the Waste Isolation Pilot Plant (WIPP) Contact Handled (CH) Waste Technical Safety Requirements (TSRs) that define the performance requirements of structures, systems, and components (SSCs), Administrative Controls, and Design Features to ensure safe operation of WIPP. CH waste handling activities performed at WIPP are governed by the WIPP CH Waste Documented Safety Analysis (CH DSA). This TSR document is prepared in accordance with guidance contained in Title 10 Code of Federal Regulations (CFR), Part 830, Subpart B, "Safety Basis Requirements." The derivation of TSRs and operational controls are contained in Chapter 5 of the CH DSA.

DOE/WIPP 97-2238, Rev. 7, Jan. 2004
Periodic Confirmation Measurement Protocol for the WIPP

This document describes the periodic confirmatory measurement (PCM) protocol that will be used to satisfy the requirements of the Memorandum of Understanding (MOU) between the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA).

DOE/WIPP 98-2287 Rev. 7.1, Aug. 2005
Functions, Responsibilities, and Authorities Manual (FRAM)

A consolidated document that covers the Carlsbad Field Office's organizations, functions, and missions. Additionally, this manual identifies direct lines of responsibility and authority for safety management functions that are essential to ensuring that safety and programmatic objectives are pursued effectively and efficiently.

DOE/WIPP 99-2194, Rev. 2
Waste Isolation Pilot Plant Environmental Monitoring Plan

This document contains the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for lab analysis, QA requirements, program implementation procedures, and direction for the preparation and disposition of reports.

DOE/WIPP 99-2286
WIPP Environmental Reporting Implementation Plan

This reporting implementation plan is a management tool designed to assist the DOE Carlsbad Field Office (CBFO) in ensuring that all relevant reporting requirements originating from environmental compliance programs are satisfied.   Appendix A

DOE/WIPP 01-3187 Rev.5
Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program

Effective date: 11/06

DOE/WIPP 01-3194 Rev. 25
CH-TRU Waste Content Codes (CH-TRUCON)

Effective date: 06/08

DOE/WIPP 01-3199  Rev. 3
Recertification Project Plan

The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals.

DOE/WIPP-02-3122 Rev.6.2
Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant
 
Effective date: 05/08

DOE/WIPP 02-3183 Rev. 4
CH Packaging Program Guidance

Effective date: 12/07

Work Instructions Listing

DOE/WIPP 02-3184 Rev. 7
CH Packaging Operations Manual
Effective date: 11/07

DOE/WIPP 02-3185 Rev. 0
CH Packaging Maintenance Manual
Effective date: 1/02

DOE/WIPP 02-3196
Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization

This document provides request authorization to allow the disposal of transuranic (TRU) wastes containing polychlorinated biphenyls (PCBs) which are duly regulated under the Toxic Substances Control Act (TSCA). 

DOE/WIPP 02-3214 Rev. 0D 
Remote Handled TRU Waste Characterization Program Implementation Plan 
Effective date: 10/30/03

DOE/WIPP 02-3220 Rev. 9
CH Packaging Operations for High Wattage Waste
Effective date: 10/06

DOE/WIPP 02-3221, Rev. 0, September 2002
No Further Action Petition for Solid Waste Management Units and Areas of Concern

This No Further Action (NFA) petition was prepared to fulfill requirements of Module VII,Section VII.O of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a).

RH Packaging Program Guidance
DOE/WIPP 02-3283 Rev. 2  
  
Effective date: 1/08

Work Instructions Listing

DOE/WIPP 02-3284 Rev. 4
RH Packaging Operations Manual

Effective date 5/08

DOE/WIPP 02-3285 Rev 1
RH Packaging Maintenance Manual

Effective date: 08/04

DOE/WIPP 03-2225
WIPP Annual Site Environmental Report 2002

Report addressing operational environmental monitoring activities.

DOE/WIPP 03-3230
Strategic Plan for Groundwater Monitoring at the WIPP
Describes the groundwater monitoring scope, objectives, responsibilities, compliance drivers, technical considerations, and overall approach to monitoring the hydrological units below the surface within the vicinity of the WIPP repository. This document provides the hierarchy for the development of specific plans for the short and long-term monitoring.

DOE/WIPP 04-2225
WIPP Annual Site Environmental Report 2003

Report addressing operational environmental monitoring activities.

DOE/WIPP 04-3231
Compliance Recertification Application
 
The recertification application showing how WIPP continues to meet all applicable federal transuranic radioactive waste standards.

DOE/WIPP 04-3310
WIPP Environmental Policy Statement
(Effective Date: 11/17/2004)

DOE/WIPP 05-2225
WIPP Annual Site Environmental Report 2004

Report addressing operational environmental monitoring activities.

DOE/WIPP 06-2225
WIPP Annual Site Environmental Report for 2005

Report addressing operational environmental monitoring activities.

DOE/WIPP-06-3174, Rev. 0

Waste Isolation Pilot Plant Remote Handled (RH) Documented Safety Analysis

November 2006, with approved page changes through August 28, 2007

Documents the safety analyses that develop and evaluate the adequacy of the WIPP RH TRU safety bases necessary to ensure the safety of workers, the public, and tRunning10he environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. 

 

DOE/WIPP-06-3178, Rev. 0

Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements


December 2006, with approved page changes through August 28, 2007
Documents the safety analyses that develop and evaluate the adequacy of the WIPP RH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. 

DOE/WIPP-06-3336 Rev. 1
CNS 10-160B RH  Cask Program Guidance, Rev. 1

Effective date 10/07

DOE/WIPP 06-3345 Rev. 2.1
Waste Isolation Pilot Plant Flammable Gas Analysis
Effective date: 02/08

DOE/WIPP 06-3347
Safety Evaluation Report (SER) of the Waste Isolation Pilot Plant Remote Handled (RH) Waste Technical Safety Requirements, Page Change 1

Approved September, 2006
This Safety Evaluation Report (SER) documents the Department of Energy’s review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2006-001 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

DOE/WIPP-06-3349
W aste Isolation Pilot Plant Safety Evaluation Report of the Remote Handled Waste Documented Safety Analysis and Technical Safety Requirements

November 2006

This Safety Evaluation Report (SER) documents the Department of Energy's (DOE's) review of Revision 0 of the Waste Isolation Pilot Plant Remote Handled (RH) Waste Documented Safety Analysis, DOE/WIPP-06-3174 (WIPP RH DSA), and the Remote Handled Technical Safety Requirements, DOE WIPP-06-3178, and provides the DOE Approval Authority with the basis for approving the document. It concludes that the safety basis documented in the WIPP RH DSA is comprehensive, correct, and commensurate with hazards associated with RH waste disposal operations. The WIPP RH DSA and associated technical safety requirements (TSRs) were developed in accordance with 10 CFR 830, Nuclear Safety Management, and DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Safety Analysis Reports.  Approved November 16, 2006.

DOE/WIPP 06-3351
Safety Evaluation Report of the Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements, Revision 0, Change 6,

December 2006
This Safety Evaluation Report (SER) documents the Department of Energy's review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2006-006 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

DOE/WIPP 06-3351

Safety Evaluation Report of the Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements, Revision 0, Change RH-2007-001
August 28, 2007
This Safety Evaluation Report (SER) documents the Department of Energy's review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2007-001 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

DOE/WIPP 07-2225
WIPP Annual Site Environmental Report for 2006

Report addressing operational environmental monitoring activities.

DOE/WIPP-07-3362
Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (Rev. 10) and Technical Safety Requirements (Rev. 10) Change 2007-001

Approved May 2007
This Safety Evaluation Report (SER) documents the Department of Energy's review of Change 2007-001 to DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

DOE/WIPP-07-3362

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (Rev. 10) and Technical Safety Requirements (Rev. 10) Change 2007-002
Approved August 28, 2007

This Safety Evaluation Report (SER) documents the Department of Energy's review of Change 2007-002 to DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.


NM                                                                       Back to top

NM 4890139088-TSDF                             
WIPP Hazardous Waste Facility Permit
Authorizes the U.S. Department of Energy to manage, store, and dispose of contact-handled transuranic mixed waste at the Waste Isolation Pilot Plant.  Mixed waste contains radioactive and chemically hazardous components.


Other                                                                   Back to top

165-F-001 Rev. V.
Standard Waste Box Assembly

Effective date: 11/13/03

165-F-010 Rev. E
TRUPACT-II Ten Drum Overpack Assembly
Effective date: 12/10/02

165-F-016-W Rev. D
Standard Large Box 2, Top Loading
Effective date: 09/20/07

165-F-017-W Rev A
Standard Large Box 2, Bottom Loading

Effective date: 09/20/07

40 CFR Part 191
Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes.

40 CFR Part 194
Criteria for the certification and re-certification of the Waste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations.

E-I-463 Rev. 4
Specification for Fabrication of the Standard Large Box 2

Effective date: 5/30/06

E-I-343 Rev. 9
Specification for Fabrication of the Standard Waste Box
Effective date: 11/07/04

E-I-430 Rev. 7
Specification for Fabrication of the Ten Drum Overpack

Effective date: 12/1/04

SW-846 Rev. 2
Test Methods for Evaluating Solid Waste, Physical/Chemical Methods

(External Link )
This document provides test procedures and guidance recommended for use in conducting the evaluations and measurements needed to comply with the Resource Conservation and Recovery Act.

WP 08-PT.01 Rev. 6
Standard Waste Box Handling and Operation Manual
Effective date: 8/7/06

WP 08-PT.02 Rev. 6
Ten Drum Overpack Handling and Operation Manual
Effective date: 2/21/2008

WP 08-PT.04 Rev. 4
CH Packaging Trailer O&M Manual
Effective date: 8/06

WP 08-PT.05, Rev. 2
TRUPACT-III Standard Large Box 2 Handling and Operation Manual

Effective date: 07/31/06

WP 08-PT.07 Rev. 3
Removable Lid Canister Handling and Operation Manual
Effective date: 8/7/06

Running1on2WP 08-PT.13 Rev.1
RH TRU 72-B Cask Uprighting Trailer Operation and Maintenance Manual

Effective date: 4/07

 


 

 

 

U.S. Department of Energy Seal

   

Notice To Users:  Use of this system constitutes consent to security monitoring and testing. All activity is logged
with your host name and IP address.  For more information, please refer to the DOE Privacy Policy

Please report problems to: webmaster@wipp.ws