All Documents:

By title

By document
number

 

 

Large file size alert
This symbol means the document
may be a large
file size.

 



All documents by title

A  B  C  D  E  F  G  H   I  J  K  L  M  N  O  P  

Q  R  S  T  U  V  W  X  Y  Z


40 CFR Part 191
Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes.

40 CFR Part 194
Criteria for the certification and re-certification of theWaste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations.


A                                                                Back to top

Accelerating Cleanup: Paths to Closure
The Department of Energy Carlsbad Field Office's proposed approach to cleaning up and closing transuranic waste storage sites.

Amendment to the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of Transuranic Waste
This Federal Register Notice relates to DOE sending contact-handled and remote-handled transuranic waste from certain generator sites as needed to the Idaho National Laboratory to be treated and characterized prior to shipment to the Waste Isolation Pilot Plant for disposal.

Annual Transuranic Waste Inventory Report - 2007 DOE/TRU-2008-3379

The information presented in the report serves as a current baseline of the TRU waste inventory for disposal at WIPP and may be considered in future Compliance Recertification Applications. The TRU Waste Inventory Profile Reports (Appendices A, B, C) reflect the information reported by the TRU waste sites. (click on the titles to view individual sections)  Effective date: 04/08

Approved Permit modifications
Approved modifications that have been incorporated into the permit.

August 2004 Solid Waste Management Report
Solid Waste Management Unit Activities from May 1, 2004 through July 31, 2004, August 2004 Quarterly Progress Report


B                                                                Back to top


C                                                                Back to top

CH-TRU Waste Content Codes (CH-TRUCON)
DOE/WIPP 01-3194 Rev. 25

Effective date: 06/08

CH Packaging Maintenance Manual
DOE/WIPP 02-3185 Rev. 0

Effective date: 1/02

CH Packaging Operations for High Wattage Waste
DOE/WIPP 02-3220 Rev. 9

Effective date: 1/08

CH Packaging Operations Manual
DOE/WIPP 02-3184 Rev. 7

Effective date: 11/07

CH Packaging Program Guidance
DOE/WIPP 02-3183 Rev. 4

Effective date: 12/07

Work Instructions Listing

CH Packaging Trailer O&M Manual
WP 08-PT.04 Rev. 4

Effective date: 8/06

CNS 10-160B RH  Cask Program Guidance, Rev. 1
DOE/WIPP-06-3336 Rev. 1

Effective date 10/07

Compliance Certification Application
DOE's 72,000-page application submitted to the U.S. Environmental Protection Agency showing how WIPP meets all applicable federal transuranic radioactive waste standards. (Click on CCA -1996)

Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement - DOE/CBFO 99-3119 Rev. 4.1 (Effective date: 12/2005)

Compliance Recertification Application 
The recertification application showing how WIPP continues to meet all applicable federal transuranic radioactive waste standards.


D                                                                Back to top


E                                                                Back to top

Environmental Assessment for Actinide Chemistry and Repository Science Laboratory
DOE/EA-1404, January 2006 Final

This document examines the potential environmental impacts associated with the proposed construction and operation of an Actinide Chemistry and Repository Science Laboratory (ACRSL) along with other reasonable alternatives to support chemical research activities related to WIPP.

Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site
DOE/EA-1340, Jan. 2001

This document examines the potential environmental consequences from conducting particular types of scientific experiments in the experiment gallery at WIPP, including the potential cumulative impacts of conducting experiments with the operation of WIPP as a TRU waste repository.

EPA Letter of Approval to Land Dispose of Non-Liquid Polychlorinated Biphenyls (PCBs) at WIPP
This document provides EPA approval for the disposal of TRU and TRU-Mixed waste containing PCBs at the WIPP.  Attached to this document is a list of conditions affecting the disposal of this waste. 

EPA Letter of  Approval for Disposal of PCB/TRU and PCB/TRU Mixed Waste at WIPP
This document provides EPA approval for the disposal of TRU and TRU-Mixed waste containing PCBs at the WIPP.  Attached to this document is a list of conditions affecting the disposal of this waste.  Dated 4/30/08


F                                                                Back to top

Functions, Responsibilities, and Authorities Manual (FRAM)
DOE/WIPP 98-2287 Rev. 7.1, Aug. 2005

A consolidated document that covers the Carlsbad Field Office's organizations, functions, and missions. Additionally, this manual identifies direct lines of responsibility and authority for safety management functions that are essential to ensuring that safety and programmatic objectives are pursued effectively and efficiently.


G                                                                Back to top


H                                                                Back to top

HalfPACT - Effective date 12/29/05

NRC Docket 71-9279     

HalfPACT Certificate of Compliance, Rev. 4
October 2005

HalfPACT Quality List
PE-04-0002
December 2004

HalfPACT Safety Analysis Report, Rev. 4
May 2005

Contact Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC), Rev. 2
May 2005

CH-TRU Payload Appendices, Rev. 1
May 2005


I                                                                 Back to top


J                                                                Back to top


K                                                                Back to top


L                                                                Back to top


M                                                                Back to top

Mobile Systems Capabilities for Transuranic Waste Characterization
A comprehensive database documenting all available technologies related to mobile characterization, treatment, and repackaging of transuranic waste.


N                                                                Back to top

The National TRU Waste Management Plan, Rev. 3 DOE/NTP-96-1204 Rev. 3
Effective date: 7/02

No Further Action Petition for Solid Waste Management Units and Areas of Concern
DOE/WIPP 02-3221, Rev. 0, September 2002

This No Further Action (NFA) petition was prepared to fulfill requirements of Module VII,Section VII.O of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a).


O                                                                Back to top

Other EPA Compliance Certification Documents 

  • CRA - 2004 - Revised Version - Incorporated EPA comment and errataEPA's Final Recertification Decision
  • EPA's requests, DOE's Responses, and EPA's Completeness Determination
  • Compliance Certification Application (CCA) Chapters and Appendices
  • CRA and CCA Compliance Application Review Documents (CARDs) and Technical Support Documents (TSDs
  • Regulatory Tools, Guidance documents for the CRA - 2004     

Other RCRA-related documentation
Links to other Permit-related documents that are available on this home page.

Overview of the WIPP Effluent Monitoring Program - technical paper
Provides an overview of the effluent air monitoring activities at WIPP. The Effluent Monitoring Program is designed to comply with the EPA radiation protection standards for management and storage of transuranic (TRU)-waste at the WIPP during the operational period. The standards issued by the EPA are contained in Title 40 CFR, Part 191, Subpart A.


P                                                                Back to top

Performance Demonstration Program Management Plan DOE/CBFO-01-3107 Rev. 4
Effective date: 04/08

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases
DOE/CBFO-95-1076 Rev. 6.1

Effective date: 11/07

Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program
DOE/CBFO-01-1006 Rev. 1

Effective date: 04/08

Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program
DOE/CBFO-01-1005 Rev.1
Effective date: 8/05

Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes
DOE/CBFO-95-1077 Rev. 7
Effective date: 9/06

Periodic Confirmation Measurement Protocol for the WIPP DOE/WIPP 97-2238, Rev. 7, Jan. 2004
This document describes the periodic confirmatory measurement (PCM) protocol that will be used to satisfy the requirements of the Memorandum of Understanding (MOU) between the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA).

Pioneering Nuclear Waste Disposal     
DOE/CAO-00-3124, Feb. 2000

Documents the 40-plus year history of the Waste Isolation Pilot Plant and looks forward to challenges for the future.

Proposed Permit modifications (Drafts)
These documents are NOT FINAL and have not been formally submitted to the permitting authority for approval. These Documents are subject to future change at the discretion of the U. S. Department of Energy (DOE).


Q                                                                Back to top

Quality Assurance Program Document
DOE/CBFO-94-1012 Rev. 9
Effective date: 12/21/07

Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program
DOE/WIPP 01-3187 Rev.5

Effective date: 11/06


R                                                                Back to top

Recertification Project Plan  DOE/WIPP 01-3199  Rev. 3
The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals.

Remote-Handled Transuranic Waste Characterization Plan
Effective date 4/30/03

Remote Handled TRU Waste Characterization Program Implementation Plan 
DOE/WIPP-02-3214 Rev. 0D 
Effective date: 10/30/03

Remote-Handled Transuranic Waste Content Codes (RH-TRUCON)
DOE/WIPP 90-045 Rev. 8

Effective date: 8/07

Remote Handled Transuranic Waste Study
DOE/CAO 95-1095, Oct. 1995

This study was conducted to satisfy the requirements defined by the WIPP Land Withdrawal Act and  considered by DOE to be a prudent exercise in the compliance certification process.

Removable Lid Canister Handling and Operation Manual
WP 08-PT.07 Rev. 3
Effective date: 8/7/06

RH-72B - Effective date 12/13/06

NRC Docket 71-9212

RH-72B Certificate of Compliance, Rev. 4
July 2006

RH-72B Safety Analysis Report, Rev. 4
June 2006

Remote Handled Transuranic Waste Authorized Methods for Payload Control (RH-TRAMPAC), Rev.0 June 2006

RH-TRU Payload Appendices, Rev. 0
June 2006

RH Packaging Maintenance Manual
DOE/WIPP 02-3285 Rev 1

Effective date: 08/04

RH Packaging Operations Manual
DOE/WIPP 02-3284 Rev. 4

Effective date 05/08

RH Packaging Program Guidance
DOE/WIPP 02-3283 Rev. 2  
  
Effective date: 1/08

Work Instructions Listing

RH TRU 72-B Cask Uprighting Trailer Operation and Maintenance Manual
WP 08-PT.13 Rev.1

Effective date: 4/07


S                                                                Back to top

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (Rev. 10) and Technical Safety Requirements (Rev. 10) Change 2007-001
DOE/WIPP-07-3362
Approved May 2007
This Safety Evaluation Report (SER) documents the Department of Energy's review of Change 2007-001 to DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (Rev. 10) and Technical Safety Requirements (Rev. 10) Change 2007-002
DOE/WIPP-07-3362
Approved August 28, 2007

This Safety Evaluation Report (SER) documents the Department of Energy's review of Change 2007-002 to DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (DSA), and Technical Safety Requirements (TSRs)
DOE/CBFO 97-1224, Revision 3
Approved November 2006
These Safety Evaluation Reports (SER) document the Department of Energy's review of the DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

Safety Evaluation Report of the Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements, Revision 0, Change 6,
DOE/WIPP 06-3351
December 2006
This Safety Evaluation Report (SER) documents the Department of Energy's review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2006-006 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

Safety Evaluation Report of the Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements, Revision 0, Change RH-2007-001
DOE/WIPP 06-3351
August 28, 2007
This Safety Evaluation Report (SER) documents the Department of Energy's review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2007-001 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

Safety Evaluation Report (SER) of the Waste Isolation Pilot Plant Remote Handled (RH) Waste Technical Safety Requirements, Page Change 1
DOE/WIPP 06-3347
Approved September, 2006
This Safety Evaluation Report (SER) documents the Department of Energy’s review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2006-001 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

Specification for Fabrication of the Standard Large Box 2
E-I-463 Rev. 4

Effective date: 5/30/06

Specification for Fabrication of the Standard Waste Box
E-I-343 Rev. 9
Effective date: 11/07/04

Specification for Fabrication of the Ten Drum Overpack
E-I-430 Rev. 7
Effective date: 12/1/04

Standard Large Box 2, Bottom Loading
165-F-017-W Rev A

Effective date: 09/20/07

Standard Large Box 2, Top Loading
165-F-016-W Rev. D
Effective date: 09/20/07

Standard Waste Box Assembly
165-F-001 Rev.
Effective date: 11/13/03

Standard Waste Box Handling and Operation Manual
WP 08-PT.01 Rev. 6
Effective date: 8/7/06

Strategic Plan for Groundwater Monitoring at the WIPP
DOE/WIPP-03-3230
Describes the groundwater monitoring scope, objectives, responsibilities, compliance drivers, technical considerations, and overall approach to monitoring the hydrological units below the surface within the vicinity of the WIPP repository. This document provides the hierarchy for the development of specific plans for the short and long-term monitoring.

Submitted RCRA Class 1 modifications to the Permit submitted in the last 90 days
View current RCRA Class 1 modifications submitted for incorporation to the Permit submitted in the last 90 days.

Submitted RCRA Class 1* (star) modifications
Class 1* (star) modifications submitted for NMED approval.

Submitted RCRA Class 2 and Class 3 Permit Modifications
View RCRA Class 2 and Class 3 modifications.

Supplement Analysis for the Disposal of Certain Rocky Flats Plutonium Bearing Materials at the Waste Isolation Pilot Plant, DOE/EIS-0026-SA-3
This document examines the environmental impacts of disposing of additional volumes of plutonium bearing materials from Rocky Flats at WIPP.  These plutonium bearing materials have plutonium concentrations similar to the Rocky Flats plutonium residues previously authorized for disposal at WIPP. 

Supplement Analysis for the Proposed Characterization for Disposal of Contact Handled Transuranic Waste at the Waste Isolation Pilot Plant, DOE/EIS-0200-SA-1
This document examines the environmental impacts of the proposal to perform characterization activities required by the WIPP Hazardous Waste Facility Permit for contact-handled waste at the WIPP.


 Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III containers

 DOE/EIS-0026-SA-06

This document examines the environmental impacts of using the Transuranic Package Transporter Model III (TRUPACT-III) containers for transporting contact-handled transuranic waste to WIPP.  September 2007

Supplement Analysis for use of the 10-160B Transportation Cask for RH-TRU Waste Shipments to WIPP DOE/EIS-0026-SA-4
This document examines the environmental impacts of using the 10-160B transportation cask for transporting remote-handled transuranic waste to WIPP.


T                                                                Back to top

Ten Drum Overpack Handling and Operation Manual
WP 08-PT.02 Rev. 6
Effective date: 2/21/2008

Test Methods for Evaluating Solid Waste, Physical/Chemical Methods SW-846 Rev. 2
(External Link )
This document provides test procedures and guidance recommended for use in conducting the evaluations and measurements needed to comply with the Resource Conservation and Recovery Act.

Transmittal of the Final Report of CBFO Recertification Audit A-07-06 of the INL Analytical Laboratories dated June 13, 2007

Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant
 DOE/WIPP-02-3122 Rev.6.2
Effective date: 05/30/2008

Transuranic Waste Baseline Inventory Report - 2004 - DOE/TRU-2006-3344
The information presented in the report was used in support of the 2004 Compliance Recertification Application (CRA).  The TRU Waste Baseline Inventory Waste Profile forms reflect the information reported by the TRU waste sites.  (click on the titles to view individual sections)

TRU Waste Performance Management Plan

TRUPACT-II - Effective date: 12/29/05

NRC Docket 71-9218

TRUPACT-II Certificate of Compliance, Rev. 18
July 2005

TRUPACT-II Safety Analysis Report, Rev. 21
May 2005

Contact Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC), Rev. 2
May 2005

CH-TRU Payload Appendices, Rev. 1
May 2005

PE-04-0001, TRUPACT-II Quality List
December 2004

TRUPACT-II Ten Drum Overpack Assembly
165-F-010 Rev. E
Effective date: 12/10/02

TRUPACT-III Standard Large Box 2 Handling and Operation Manual
WP 08-PT.05, Rev. 2

Effective date: 07/31/06


U                                                                Back to top

U.S. Environmental Protection Agency's (EPA's) Final Decision letter approving Department of Energy's (DOE's) remote handled (RH) transuranic (TRU) Waste Characterization Program Implementation Plan (WCPIP), Revision 0D, and the RH TRU Waste Characterization Plan for the Waste Isolation Pilot Plant
Effective date: 3/26/04


V                                                                Back to top


W                                                                Back to top

Waste Acceptance Criteria
(See Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant)

Waste Isolation Pilot Plant Environmental Monitoring Plan DOE/WIPP 99-2194, Rev. 2
This document contains the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for lab analysis, QA requirements, program implementation procedures, and direction for the preparation and disposition of reports.

Waste Isolation Pilot Plant Flammable Gas Analysis
DOE/WIPP 06-3345 Rev. 2.1

Effective date: 02/08

Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization DOE/WIPP 02-3196,
This document provides request authorization to allow the disposal of transuranic (TRU) wastes containing polychlorinated biphenyls (PCBs) which are duly regulated under the Toxic Substances Control Act (TSCA). 

Waste Isolation Pilot Plant Remote Handled (RH) Documented Safety Analysis
DOE/WIPP-06-3174, Rev. 0
November 2006, with approved page changes through August 28, 2007

Documents the safety analyses that develop and evaluate the adequacy of the WIPP RH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase.

Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements
DOE/WIPP-06-3178, Rev. 0
December 2006, with approved page changes through August 28, 2007

Documents the safety analyses that develop and evaluate the adequacy of the WIPP RH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. 

Waste Isolation Pilot Plant Safety Evaluation Report of the Remote Handled Waste Documented Safety Analysis and Technical Safety Requirements
DOE/WIPP-06-3349
November 2006

This Safety Evaluation Report (SER) documents the Department of Energy's (DOE's) review of Revision 0 of the Waste Isolation Pilot Plant Remote Handled (RH) Waste Documented Safety Analysis, DOE/WIPP-06-3174 (WIPP RH DSA), and the Remote Handled Technical Safety Requirements, DOE WIPP-06-3178, and provides the DOE Approval Authority with the basis for approving the document. It concludes that the safety basis documented in the WIPP RH DSA is comprehensive, correct, and commensurate with hazards associated with RH waste disposal operations. The WIPP RH DSA and associated technical safety requirements (TSRs) were developed in accordance with 10 CFR 830, Nuclear Safety Management, and DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Safety Analysis Reports.  Approved November 16, 2006.

WIPP Annual Site Environmental Report for 2006 DOE/WIPP-07-2225
Report addressing operational environmental monitoring activities.

WIPP Annual Site Environmental Report 2005 DOE/WIPP-06-2225
Report addressing operational environmental monitoring activities.
 

WIPP Annual Site Environmental Report 2004 DOE/WIPP-05-2225
Report addressing operational environmental monitoring activities.

WIPP Annual Site Environmental Report 2003 
DOE/WIPP 04-2225
Report addressing operational environmental monitoring activities.

WIPP Annual Site Environmental Report 2002 DOE/WIPP-03-2225
Report addressing operational environmental monitoring activities.

WIPP Contact Handled (CH) Waste Documented Safety Analysis (DSA)
DOE/WIPP-95-2065, Rev. 10, November 16, 2006, with approved page changes through August 28, 2007
Documents the safety analyses that develop and evaluate the adequacy of the WIPP CH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase.

WIPP Contact Handled (CH) Technical Safety Requirements
DOE/WIPP-95-2125, Rev. 10 November 16, 2006, with approved page changes through August 28, 2007
This document contains the Waste Isolation Pilot Plant (WIPP) Contact Handled (CH) Waste Technical Safety Requirements (TSRs) that define the performance requirements of structures, systems, and components (SSCs), Administrative Controls, and Design Features to ensure safe operation of WIPP. CH waste handling activities performed at WIPP are governed by the WIPP CH Waste Documented Safety Analysis (CH DSA). This TSR document is prepared in accordance with guidance contained in Title 10 Code of Federal Regulations (CFR), Part 830, Subpart B, "Safety Basis Requirements." The derivation of TSRs and operational controls are contained in Chapter 5 of the CH DSA.

WIPP Environmental Reporting Implementation Plan
DOE/WIPP 99-2286

This reporting implementation plan is a management tool designed to assist the DOE Carlsbad Field Office (CBFO) in ensuring that all relevant reporting requirements originating from environmental compliance programs are satisfied.   Appendix A

WIPP Disposal Phase Supplemental Environmental Impact Statement (SEIS-II)
This document assesses whether to dispose of TRU waste at WIPP. This document also assesses reasonable options for transportation and other activities associated with disposal, as well as reasonable alternatives concerning quantities, sources, and treatment of TRU waste before disposal.

WIPP Environmental Policy Statement - DOE/WIPP 04-3310 (Effective Date: 11/17/2004)

WIPP Hazardous Waste Facility Permit     
NM 4890139088-TSDF

Authorizes the U.S. Department of Energy to manage, store, and dispose of contact-handled transuranic mixed waste at the Waste Isolation Pilot Plant.  Mixed waste contains radioactive and chemically hazardous components.

WIPP Land Management Plan
Describes how the Department of Energy manages the WIPP Land Withdrawal Area.

WIPP Waste Information System User's Manual WWIS Version 6.2
DOE/CBFO- 97-2273, Rev. 15
May 2008


X                                                                Back to top


Y                                                                Back to top


Z                                                                Back to top

 

 

 

 

U.S. Department of Energy Seal

   

Notice To Users:  Use of this system constitutes consent to security monitoring and testing. All activity is logged
with your host name and IP address.  For more information, please refer to the DOE Privacy Policy

Please report problems to: webmaster@wipp.ws