All Documents:

By title

By document
number

 

 

Large file size alert
This symbol means the document
may be a large
file size.

 



Nuclear Safety

Response Plan Restoration of Fire Suppression Safety Function to Support Waste Emplacement WTS Fire Suppression System dated April 29, 2008, including the Approved Safety Evaluation Report, dated April 30, 2008
NS-RP-2008-01
Approved April 29, 2008

 

Justification for Continued Operation (JCO) Basis to Continue Normal Operations During Repair of the WTS Fire Suppression System, including, the Approved Safety Evaluation Report, dated May 07, 2008
NS-RP-2008-02

Approved May 07, 2008

 

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (Rev. 10) and Technical Safety Requirements (Rev. 10) Change 2007-001
DOE/WIPP-07-3362
Approved May 2007


This Safety Evaluation Report (SER) documents the Department of Energy's review of Change 2007-001 to DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (Rev. 10) and Technical Safety Requirements (Rev. 10) Change 2007-002
DOE/WIPP-07-3362
Approved August 28, 2007

This Safety Evaluation Report (SER) documents the Department of Energy's review of Change 2007-002 to DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis (DSA), and Technical Safety Requirements (TSRs)
DOE/CBFO 97-1224, Revision 3
Approved November 2006
These Safety Evaluation Reports (SER) document the Department of Energy's review of the DOE/WIPP 95-2065, Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis and the DOE/WIPP-95-2125, Contact Handled Technical Safety Requirements (TSRs), Rev 10, and provides the DOE Approval Authority with the basis for approving the documents.

Safety Evaluation Report of the Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements, Revision 0, Change 6,
DOE/WIPP 06-3351
December 2006
This Safety Evaluation Report (SER) documents the Department of Energy's review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2006-006 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

Safety Evaluation Report of the Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements, Revision 0, Change RH-2007-001
DOE/WIPP 06-3351
August 28, 2007
This Safety Evaluation Report (SER) documents the Department of Energy's review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2007-001 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

 

Safety Evaluation Report (SER) of the Waste Isolation Pilot Plant Remote Handled (RH) Waste Technical Safety Requirements, Page Change 1
DOE/WIPP 06-3347
Approved September, 2006
This Safety Evaluation Report (SER) documents the Department of Energy’s review of the Remote Handled Technical Safety Requirements (TSRs) page change RH-2006-001 to DOE/WIPP 06-3178, Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements and provides the DOE Approval Authority with the basis for approving the document.

WIPP Contact Handled (CH) Waste Documented Safety Analysis (DSA)
DOE/WIPP-95-2065, Rev. 10, November 16, 2006, with approved page changes through August 28, 2007
Documents the safety analyses that develop and evaluate the adequacy of the WIPP CH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase.

WIPP Contact Handled (CH) Technical Safety Requirements
DOE/WIPP-95-2125, Rev. 10 November 16, 2006, with approved page changes through August 28, 2007
This document contains the Waste Isolation Pilot Plant (WIPP) Contact Handled (CH) Waste Technical Safety Requirements (TSRs) that define the performance requirements of structures, systems, and components (SSCs), Administrative Controls, and Design Features to ensure safe operation of WIPP. CH waste handling activities performed at WIPP are governed by the WIPP CH Waste Documented Safety Analysis (CH DSA). This TSR document is prepared in accordance with guidance contained in Title 10 Code of Federal Regulations (CFR), Part 830, Subpart B, "Safety Basis Requirements." The derivation of TSRs and operational controls are contained in Chapter 5 of the CH DSA.

Waste Isolation Pilot Plant Remote Handled (RH) Documented Safety Analysis
DOE/WIPP-06-3174, Rev. 0
November 2006, with approved page changes through August 28, 2007

Documents the safety analyses that develop and evaluate the adequacy of the WIPP RH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. 

Waste Isolation Pilot Plant Remote Handled (RH) Technical Safety Requirements
DOE/WIPP-06-3178, Rev. 0
December 2006, with approved page changes through August 28, 2007

Documents the safety analyses that develop and evaluate the adequacy of the WIPP RH TRU safety bases necessary to ensure the safety of workers, the public, and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. 

Waste Isolation Pilot Plant Safety Evaluation Report of the Remote Handled Waste Documented Safety Analysis and Technical Safety Requirements
DOE/WIPP-06-3349
November 2006

This Safety Evaluation Report (SER) documents the Department of Energy's (DOE's) review of Revision 0 of the Waste Isolation Pilot Plant Remote Handled (RH) Waste Documented Safety Analysis, DOE/WIPP-06-3174 (WIPP RH DSA), and the Remote Handled Technical Safety Requirements, DOE WIPP-06-3178, and provides the DOE Approval Authority with the basis for approving the document. It concludes that the safety basis documented in the WIPP RH DSA is comprehensive, correct, and commensurate with hazards associated with RH waste disposal operations. The WIPP RH DSA and associated technical safety requirements (TSRs) were developed in accordance with 10 CFR 830, Nuclear Safety Management, and DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Safety Analysis Reports.  Approved November 16, 2006.

 


 

 

 

 

U.S. Department of Energy Seal

   

Notice To Users:  Use of this system constitutes consent to security monitoring and testing. All activity is logged
with your host name and IP address.  For more information, please refer to the DOE Privacy Policy

Please report problems to: webmaster@wipp.ws