These documents are highly technical scientific documents and may be quite large in file size.  Please be patient while downloading.

 

 

 



RH-Packaging Program Guidance and Operating and Maintenance Instructions

Document

Effective Date

WI-RH.01 Revision 1
Replacement of IV/OC Port Closure Bolts and O-rings

05/08

WI-RH.02 Revision 1
Replacement of IV/OC Lid Main O-Rings

05/08

WI-RH.03
Replacement of Lid Closure and Impact Limiter Attachment Bolts

10/07

WI-RH.04
Replacement of Miscellaneous Parts Not Requiring Detailed Instructions

04/07
WI-RH.05 Revision 0.2
Cleaning IV/OC Threads, Impact Limiter Threads, Threaded Inserts and Port Inserts
07/08
WI-RH.06
IV/OC Sealing Surface Finish Inspection
09/07
WI-RH.07
Minor Repair of IV and OC Lid and Body Exposed Surfaces
04/07
WI-RH.08 Revision 1
Annual and Five-Year Maintenance Inspections
05/08
WI-RH.10
Painting Markings on 72B Casks
06/07
WI_RH-20
Replacement of 10-160B Test/Vent Port Plugs and O-Rings
10/07
WI-RH-21
Replacement of CNS 10-160B Lid O-Rings
10/07
WI-RH-22
Replacement/Repair of 10-160B Lid Bolts and Lift Lug Bolts
10/07
WI-RH-23
Replacement of Impact Limiter Ratchet Binders
10/07

 

 

 

 

 

Most documents
are in PDF format.
Click on the link above
to download
Adobe Reader.

 

 

 

U.S. Department of Energy Seal

   

Notice To Users:  Use of this system constitutes consent to security monitoring and testing. All activity is logged
with your host name and IP address.  For more information, please refer to the DOE Privacy Policy

Please report problems to: webmaster@wipp.ws