A - General Facility Description
and Process Information -
Mar 25, 2008
-
B - Waste Analysis Plan-
Mar 25, 2008
-
B1 - Waste Characterization
Sampling Methods -
Mar 25, 2008
-
B2 - Statistical Methods Used in
Sampling and Analysis -
Mar 25, 2008
-
B3 - Quality Assurance Objectives
and Data Validation Techniques for Waste Characterization Sampling and
Analytical Methods -
Mar 25, 2008
-
B4 - TRU Mixed Waste
Characterization Using Acceptable Knowledge -
Feb 27, 2007
-
B5 - Quality Assurance Project
Plan Requirements - Feb 27, 2007
-
B6 - Waste Isolation Pilot Plant
Permittees' Audit and Surveillance Program -
Mar 25, 2008
-
B7 -
Permittee Level TRU Waste Confirmation Processes
- Mar 25, 2008
-
C - Security - Oct 16, 2006
-
D -
Inspection Schedule, Process and Forms
- Mar 25, 2008
-
D1 - Inspection Sheets, Logs, and
Instruction Sheets for Systems/Equipment Requiring Inspection Reserved - Aug 31, 2001
-
E -
Preparedness and Prevention -
Mar 25, 2008
-
F - RCRA Contingency Plan
- Mar 25, 2008
-
G - Traffic Patterns -
Mar 25, 2008
-
H - Personnel Training - Oct 16, 2006
-
H1 - RCRA Hazardous Waste
Management Job Titles and Descriptions
- Mar 25, 2008
-
H2 - Training Course and
Qualification/Certification Card Outlines -
June 22, 2007
-
I - Closure Plan -
Mar 25, 2008
-
I1 - Detailed Design Report for an Operation Phase Panel Closure System - Jan 30, 2003
-
I1-G - Technical Specifications, Panel Closure System - Jan 30, 2003
-
I1-H - Design Drawings - Oct 27, 1999
-
I2 - Shaft Sealing System
Compliance Submittal Design Report -
Feb 27, 2007
-
I2-A - Material Specifications -
Mar 25, 2008
-
I2-B - Shaft Sealing Construction
Procedures - Oct 27, 1999
-
I2-E -
Design Drawings - Part 1 - Oct 27,
1999
-
I3 - Radiological Surveys to
Indicate Potential Hazardous Waste Releases -
Feb 27, 2007
-
J - Post-Closure Plan - Oct 16, 2006
-
J1 - Active Institutional Controls - Oct 16, 2006
-
K -
Reserved - Aug 9, 2000
-
L - WIPP Groundwater Detection
Monitoring Program Plan - Feb 27, 2007
-
M - Information for Specific Units - Oct 16, 2006
-
M1 - Container Storage -
Mar 25, 2008
-
M2 - Geologic Repository -
Mar 25, 2008
-
M3 - Drawing Number 51-W-214-W,
"Underground Facilities Typical Disposal Panel" - Oct 27, 1999
-
N - Confirmatory Volatile Organic
Compound Monitoring Plan - Mar 25, 2008
-
N1 - Hydrogen and
Methane Monitoring Plan - Mar 25, 2008
-
O - Hazardous Waste Permit
Application Part A -
Mar 25, 2008
-
P - WIPP Technical Procedures
Referenced in Other Attachments - July 8, 2005
-
Q - Mine Ventilation Rate
Monitoring Plan- Oct 27, 1999