|

|
This Marietta drum miner can mine up to 875 tons/shift.
With a 3.5m wide cutting head, openings 4m x 8m can be advanced at a rate of
about 15m per shift. To the extent that the prime mission of waste
disposal at WIPP is not compromised, the facilities and equipment can be
used to lower the cost of creating customized cavities and conducting
research at WIPP. Current estimates to create custom cavities indicate
about $25/ton, with
less for larger-volume cavities. This includes bulkheads for
ventilation control, lighting, and power distribution. Actual costs
will depend to a large extent on total volume and configuration
complexity. The
following lists mine operations and surface support infrastructure available to
researchers: |
| Hoist Operations |
Engineering Support |
Meeting Rooms |
| Electrical Services |
Warehouse/Receiving Support |
Cafeteria |
| Mine Rescue & Fire Protection |
Surface & U/G Shops |
Showers & Lockers |
| Ground Control & Inspection |
5-40 ton forklifts |
Analytical Services (Rad + chem) |
| Muck Removal & Disposal |
IH & Waste Management Services |
Guard & Security Services |
| Ventilation Services |
Personnel Carts |
U/G & Surface LAN - 10BaseT |
| Liquid Nitrogen |
24-Strand Fiber Optic to U/G |
3 Phase - 480VAC Power |
Return to WIPP U/G Lab page
|