WIPP Hazardous Waste
Facility Permit Draft Renewal Application dated 6/29/10
Table of Contents
Abbreviations and Acronyms
List of Tables
List of Figures
List of Drawings
Introduction
Regulatory Crosswalk
Summary of Proposed Changes
RCRA Application and Certification
Hazardous Waste Permit Application - Part A
Photographs
Photographs - Part A
Necessary Information – Part A
Active Environmental Permits
Maps and Illustrations
Necessary Information – Part B
Demographics and Windrose
Public Participation Information
Chapter A: General Facility Description and Process Information
Chapter B: Waste Analysis Plan
Addendum B1: Totals Analysis versus Toxicity Characteristic
Leaching Procedure
Addendum B2: Chemical Compatibility Analysis of Waste Forms and
Container Materials
Appendix B1: Waste Characterization Sampling Methods
Appendix B2: Statistical Methods Used in Sampling and Analysis
Appendix B3: Quality Assurance Objectives and Data Validation
Techniques for Waste Characterization Sampling and Analytical
Methods
Appendix B4: TRU Mixed Waste Characterization Using Acceptable
Knowledge
Appendix B5: Quality Assurance Project Plan Requirements
Appendix B6: Waste Isolation Pilot Plant Permittees' Audit and
Surveillance Program
Appendix B7: Permittee Level TRU Waste Confirmation Processes
Chapter C: Security
Chapter D: Inspection Schedule, Process and Forms
Appendix D1: Inspection Sheets, Logs, and Instruction Sheets for
Systems / Equipment Requiring Inspection
Chapter E: Preparedness and Prevention
Chapter F: RCRA Contingency Plan
Chapter G: Traffic Patterns
Chapter H: Personnel Training
Appendix H1: RCRA Hazardous Waste Management Job Titles and
Descriptions
Appendix H2: Training Course and Qualification Card Outlines
Chapter I: Closure Plan
Appendix I1: Detailed Design Report for an Operational Phase
Panel Closure System
Appendix I1G: Technical Specifications
Appendix I1H: Design Drawings – Panel Closure System
Appendix I2: Waste Isolation Pilot Plant Shaft Sealing System
Compliance Submittal Design Report
Appendix I2A: Material Specification – Shaft Sealing System
Compliance Submittal Design Report
Appendix I2B: Shaft Sealing Construction Procedures Shaft
Sealing System Compliance Submittal Design
Report
Appendix I2E: Design Drawings – Shaft Sealing System Compliance
Submittal Design Report
Appendix I3: Radiological Surveys to Indicate Potential
Hazardous Waste Releases
Chapter J: Post-Closure Plan
Appendix J1: Active Institutional Controls during Post-Closure
Chapter K: Reserved
Chapter L: WIPP Ground-Water Detection Monitoring Program Plan
Addendum L1: Site Characterization
Chapter M: Information for Specific Units
Appendix M1: Container Storage
Appendix M2: Geologic Repository
Appendix M3: Drawing Number 51-214w, Underground Facilities
Typical Disposal Panel
Chapter N: Volatile Organic Compound Monitoring Plan
Addendum N1: 300-Year Performance Demonstration Re-Evaluation
Appendix N1: Hydrogen and Methane Monitoring Plan
Chapter O: Reserved
Chapter P: Summaries of WIPP Technical Procedures Referenced in
other Chapters
Chapter Q: WIPP Mine Ventilation Rate Monitoring Plan
|